Kondakova, Yelena Vladimirovna (1957-) Russian engineer cosmonaut. Flew on Mir EO-17, STS-84. Engineer, first Russian woman to fly in space for other than propaganda reasons. Was married to astronaut Valeriy Ryumin. Civilian Engineer, Energia NPO
Educated Bauman.
Official NASA Biography - 1997
PERSONAL DATA: Born March 30, 1957, in Mitischi, Moscow Region. Married to Valerii V. Ryumin, born 1939 in Komsomolskna-Amure, Kharbarovsk Region, Russia. They have one child. Kondakova enjoys the theater, river fishing, reading, traveling. Her father, Vladimir A. Kondakov and her mother, Klavdiya S. Kondakova (Morozova), reside in Kaliningrad, Moscow Region. His parents, Viktor N. Ryumin and Alexandra F. Ryumina (Podporina), are deceased.
EDUCATION: Graduated from Moscow Bauman High Technical College in 1980.
SPECIAL HONORS: Hero of Russia.
EXPERIENCE: Upon graduation, in 1980, Kondakova started to work in RSC-Energia completing science projects, experiments and research work. Then in 1989 she was selected as a cosmonaut candidate by RSC-Energia Main Design Bureau and sent to Gagarin Cosmonaut Training Center to start the course of general space training. After finishing the course in March, 1990, Kondakova was qualified as "test cosmonaut". From January through June of 1994, she was under training for the 17th main mission and "Euromir-94" flight as a flight engineer of the prime crew. October 4, 1994 through March 22, 1995, she fulfilled her first flight on board the spacecraft "Soyuz TM-17" and the orbital complex "Mir" as a flight engineer of the 17th main mission. She spent 169 days in space, including 5 days with NASA Astronaut Norman Thagard. The program included a month long joint flight with German Astronaut Ulf Merbold. Most recently, she was a mission specialist on STS-84 (May 15-24, 1997), NASA's sixth Shuttle mission to rendezvous and dock with the Russian Space Station Mir. Mission duration was 9 days, 5 hours and 20 minutes. In completing her second flight, Kondakova has logged over 178 days in space.
JULY 1997
Birth Place: Komsomolskna-Amure, Kharbarovsk.
Status: Inactive.
Born: 1957.03.30.
Spaceflights: 2 .
Total time in space: 178.45 days.
More... - Chronology...
Associated Countries
See also
-
Cosmonaut Category of persons who have been trained for spaceflight in Russia. More...
Associated Flights
-
Mir EO-16 Crew: Malenchenko, Musabayev. Mir Expedition EO-16. Soyuz TM-19 docked at the rear port of the Kvant module (vacated by Progress M-23 on July 2) at 13:55:01 GMT on July 3. Soyuz TM-19 undocked from Mir at 07:29 GMT on November 4. The Soyuz instrument module (PAO, priborno-agregatniy otsek) fired its deorbit engine, and was jettisoned together with the orbital module (BO, bitovoy otsek) at 10:51 GMT, with entry interface for the descent module (SA, spuskaemiy apparat) at 10:54. It landed 170 km north-east of Arkalyk in Kazakhstan on 1994 November 4 at 11:18 GMT. Backup crew: Viktorenko, Kondakova. More...
-
Mir Euromir 94 Crew: Merbold. German astronaut. Primary mission to swap Soyuz lifeboats. Backup crew: Duque. More...
-
Mir EO-17 Crew: Kondakova, Viktorenko. Mir Expedition EO-17. Docked at the Mir forward port at 00:28 on 1994 October 6. The Mir crew of Viktorenko, Kondakova and Polyakov boarded Soyuz TM-20 on January 11, and undocked from Mir's front port at 09:00 GMT. The spacecraft withdrew to about two hundred metres from Mir and then redocked in a test of the automatic Kurs system, which had failed in Progress M-24's attempted docking. Redocking came at 09:25 GMT. Soyuz TM-20 landed 22 km northeast of Arkalyk in Kazakhstan at 04:04 GMT on March 22, 1995. Backup crew: Gidzenko, Avdeyev. More...
-
Mir NASA-4 Crew: Foale. Foale relieved Linenger as NASA resident on the Mir station. Backup crew: Voss. More...
-
STS-84 Crew: Clervoy, Collins Eileen, Kondakova, Lu, Noriega, Precourt. Delivered to Mir and returned to earth 2500 kg of payload. More...
Associated Manufacturers and Agencies
-
Korolev Russian manufacturer of rockets, spacecraft, and rocket engines. Korolev Design Bureau, Kaliningrad, Russia. More...
Associated Programs
-
Mir The Mir space station was the last remnant of the once mighty Soviet space programme. It was built to last only five years, and was to have been composed of modules launched by Proton and Buran/Energia launch vehicles. These modules were derived from those originally designed by Chelomei in the 1960's for the Almaz military station programme. As the Soviet Union collapsed Mir stayed in orbit, but the final modules were years late and could only be completed with American financial assistance. Kept flying over a decade beyond its rated life, Mir proved a source of pride to the Russian people and proved the ability of their cosmonauts and engineers to improvise and keep operations going despite all manner of challenges and mishaps. More...
Bibliography
-
NASA Astronaut Biographies, Johnson Space Center, NASA, 1995-present. Web Address when accessed: here.
Kondakova Chronology
1989 January 25 - .
1994 October 3 - .
22:42 GMT - .
Launch Site: Baikonur. Launch Complex: Baikonur LC1. LV Family: R-7. Launch Vehicle: Soyuz 11A511U2. - Soyuz TM-20 - .
Call Sign: Vityaz (Knight ). Crew: Kondakova; Merbold; Viktorenko. Backup Crew: Budarin; Reiter; Solovyov. Payload: Soyuz TM 11F732 s/n 69. Mass: 7,150 kg (15,760 lb). Nation: Russia. Related Persons: Kondakova; Merbold; Viktorenko; Budarin; Reiter; Solovyov. Agency: MOM. Program: Mir. Class: Manned. Type: Manned spacecraft. Flight: Mir EO-17; Mir Euromir 94; Mir EO-16; Mir LD-4. Spacecraft: Soyuz TM. Duration: 169.22 days. Decay Date: 1995-03-02 . USAF Sat Cat: 23288 . COSPAR: 1994-063A. Apogee: 395 km (245 mi). Perigee: 392 km (243 mi). Inclination: 51.6000 deg. Period: 92.43 min. Mir Expedition EO-17. Docked at the Mir forward port at 00:28 on 1994 October 6. The Mir crew of Viktorenko, Kondakova and Polyakov boarded Soyuz TM-20 on January 11, and undocked from Mir's front port at 09:00 GMT. The spacecraft withdrew to about two hundred metres from Mir and then redocked in a test of the automatic Kurs system, which had failed in Progress M-24's attempted docking. Redocking came at 09:25 GMT.
1995 March 22 - .
1997 May 15 - .
08:07 GMT - .
Launch Site: Cape Canaveral. Launch Complex: Cape Canaveral LC39A. LV Family: Shuttle. Launch Vehicle: Shuttle. LV Configuration: Space Shuttle STS-84. - STS-84 - .
Call Sign: Atlantis. Crew: Precourt; Collins, Eileen; Clervoy; Lu; Noriega; Kondakova; Foale. Backup Crew: Titov, Vladimir. Payload: Atlantis F19 / Spacehab Double Module. Nation: USA. Related Persons: Precourt; Collins, Eileen; Clervoy; Lu; Noriega; Kondakova; Foale; Titov, Vladimir. Agency: NASA Houston. Program: Mir. Class: Manned. Type: Manned spaceplane. Flight: STS-84; Mir NASA-4; Mir NASA-3; Mir EO-23. Spacecraft: Atlantis. Duration: 9.22 days. Decay Date: 1997-05-24 . USAF Sat Cat: 24804 . COSPAR: 1997-023A. Apogee: 393 km (244 mi). Perigee: 377 km (234 mi). Inclination: 51.7000 deg. Period: 92.30 min. Atlantis blasted off on a night launch to Mir, docking with the station on May 17 at 02:33 GMT. Jerry Linenger, who had begun his stay on Mir in mid-January aboard STS-81, would return aboard STS-84. Michael Foale would be left at the station for his stint as the American crew member of Mir. The crew transfered to Mir 466 kg of water, 383 kg of U.S. science equipment, 1,251 kg of Russian equipment and supplies, and 178 kg of miscellaneous material. Returned to Earth aboard Atlantis were 406 kg of U.S. science material, 531 kg of Russian logistics material, 14 kg of ESA material and 171 kg of miscellaneous material. Atlantis undocked from Mir at 01:04 GMT on May 22. After passing up its first landing opportunity due to clouds over the landing site, the Shuttle fired its OMS engines on the deorbit burn at 12:33 GMT on May 24. Atlantis landed at 13:27 GMT at Kennedy Space Center's runway 33.
1997 May 24 - .
Home - Browse - Contact
© / Conditions for Use